精品国产偷窥一区二区,亚洲精品沙发午睡系列,一二三四视频在线观看日本,肥婆巨肥bbbwbbbwbbwbw

THE 10th ALL IN PRINT CHINA

第十屆中國國際全印展

全印展

中國國際印刷技術及設備器材展

China International Exhibition for All Printing Technology & Equipment

October 12-16, 2026

上海新國際博覽中心

Shanghai New International Expo Centre

Supported by

印刷展

Dubai Sets Out to Become the World’s 3D Printing Hub

Time:2018-08-06 From:


The small emirate Dubai has got an ambitious plan: In 2030, it wants to be the world’s leading 3D printing capital. By then, 25 % of every new building in Dubai shall be constructed by means of 3D printing.


The small emirate Dubai aims high regarding the usage of three-dimensional printing technology: In 2030, the popular travel destination at the Persian Gulf wants to be the world’s leading 3D printing capital. The trend-setting technology shall primarily improve the emirate’s consumer and health care sectors as well as the construction industry. These goals are defined by the ‘Dubai 3D Printing Strategy’ which was launched by Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the United Arab Emirates and Ruler of Dubai, in 2016.
 

Generous Sponsorships for 3D Printing Industry

 

In order to push ahead its ambitious plan, Dubai promises generous sponsorship for established companies, but above all for startups in the 3D printing industry. Additionally, the Emirate offers them spacious premises in industrial and technology parks that are being built on the outskirts of the capital. In fact, 3D printing has already begun to renew many industries. Next year, the company Polymaker plans to launch the first 3D-printed car compatible for mass production. In the health care sector, numerous prostheses are now being adjusted to patients with laser scan and 3D printers. Entire organs are already manufactured by means of modern 3D-printing technology for pre-operative planning purposes.

 

The most spectacular 3D printing innovations are yet to be found in the construction industry. In May 2016, a fully functional 3D-printed office building, including furniture and interior design, opened its doors in Dubai. The ‘Office of the Future’ was realized by a 20 feet high, 120 feet long and 40 feet wide 3D printer including an automated robotic arm to implement the printing process. Within only 17 days, the entire structure of the building was printed by this giant cement printer. Two more days were needed for the installation of the printed parts on site plus approximately three months for all subsequent work such as interiors, building services and landscape.

 

3D Printing Offers Immense Time- and Cost-Savings Potential

 

The ‘Office of the Future’ is a shining example of Dubai’s deep commitment to 3D printing. Another proof of how serious Dubai takes the promotion of 3D-printing technologies is reflected again in the ‘Dubai 3D Printing Strategy’: According to this initiative, 25 percent of every new building in Dubai shall be constructed by means of 3D printing technology by 2025, starting in 2019 at 2 percent with a gradual increase to the strategic goal. Thereby, construction costs shall be reduced by up to 70 percent, time reduction is estimated to be up to 80 percent.

主站蜘蛛池模板: 曲周县| 彭阳县| 涟源市| 张家口市| 庄浪县| 武陟县| 新竹县| 改则县| 叶城县| 同仁县| 岳阳县| 彰化县| 当阳市| 江源县| 隆子县| 阜平县| 正蓝旗| 福建省| 松滋市| 安义县| 卢湾区| 长兴县| 南昌县| 淳安县| 莱芜市| 巴东县| 福清市| 淳安县| 玛沁县| 江西省| 临朐县| 清涧县| 黄冈市| 白朗县| 漳浦县| 平顶山市| 和顺县| 江山市| 双鸭山市| 漳平市| 进贤县|